£5.7m Development Finance Secured On A Part-Completed Scheme Of 25 South-West London Apartments
When developments experience delays, existing funding can stop working as it should. Refinancing a partially completed site can be challenging. Fortunately, even with a down-valuation, we were able to arrange a new facility which will enable our client to commplete the scheme and secure a long-term exit.
Facility: £5,700,000
GDV: £8,800,000
Works Remaining: £3,200,000
Loan Type(s): Development Finance
Security Type: Partially Completed Development Site
Term: 24 Months
About the Deal
A long-standing client came to us after their development lender stopped further drawdowns. A delayed start on site meant the original programme was no longer achievable, and the scheme had moved outside the lender’s loan-to-GDV limits.
The Challenge
With £3.2m of works still to complete, the client needed to refinance the existing debt and secure funding to finish the build. The challenge was finding a lender willing to step in mid-build, understand what had happened to date and get comfortable with the remaining works and revised programme. A lower-than-expected valuation then reduced what the new lender could advance against the development on day one.
The Result
Through close work with a lender we knew would be able to get comfortable with the scheme, client, and history of the site, we were able to strucutre a facility which worked for all parties, bringing in a second property as additional security. This allowed the new lender to release enough on day one to repay the existing facility, with funding for the remaining works built into the new loan.
The refinance has now completed, and the client has the funding in place to finish the scheme.